64 comments found.
Hi, nice work, I like it. Is there a possibility to change colors of the theme? My presentation should be in red. The rest would fit perfectly.
Hello, yes you can change colors of any elements in one click exept background. It should be light.
I love your work on this project, just beautiful! I am trying to edit the photos in the timeline and photos 5 and 6 seem to be using repeats. I am only able to use 4 photos which means in this segment there are two duplicate photos. How do I fix?
Hello, sorry, but i haven’t access to my pc on this weekends, i’m on little trip right now. I will be able to open project and help you in 2 days. Sorry again and thanks for using my project and your feedback
Sorry, this is my fail in project. But is very easy to fix by yourself. Simple dublicate photo placeholder (“03 Timeline Inside Photo 4” for example) by CTRL+D on project window, recieve “03 Timeline Inside Photo 5” and swap this file with dublicate on timeline (select layer on timeline and drag your new created comp on timeline with holding ALT button)
Thanks!
Hi,
how do you add extra values for the pie graph? As it stands there are 4 in the demo data but I need 6.
Cheers
Hello, i can help you and send you the small fix to project with 6-sections pie graph inside. Please give me your mail, or send me the blank message on b33@ukr.net
Thanks!
Hi, recently purchased this and have a quick question re the compositions.
By the way – nice work! Very professional!! 
When I duplicate a pie chart composition and change the text, it auto changes it for the second item but what I want is to have two different labels for each composite.
How do I this?
Thanks
Hello! Thanks for using my project and your feedback.
You have to dublicate your chart composition and all composition inside it. You can do it manually, but i prefer to use this script: “http://aescripts.com/true-comp-duplicator/” (it’s free to try)
Also here is a one trick. Just drag another copy of zen*.aep file into your project and use second copy of any comp
That’s it.
Sorry for bit late reply. Have a nice day!
Hello, when I open the project, this message appears: http://prntscr.com/8yllza, Can you help me solve the problem.
Hello. What version of AE software do you use?
In any case, try to ignore this message and start working with project, this problem isn’t so important.
Hello, two questions. Is it possible to change the number of bars in the chart? So instead of 10 bars, the presentation show only 7? And how can i extend the duration of the slides? It is to short, the next slide comes to quickly.
Hello, yes you can do that with advance AE skills. But without them in any case i will help you with this
Can the orange anchor color be changed?
Hello, yes, colors can be changed in 1 click.
How can I delete the white background on all the comps?
Hello!
Open “Background” composition in the Project section or in one of the comp (this layer is hidden, turn of the “shy” laters to see it) and turn of the visibility of white solid. It turns all background to alpha.
Hope that helps.
For more deep help please send me the message on b33@ukr.net.
Thaks
You create very high quality & amazing stuff! Very pro – very profit)
Thank you ! 
Cool project, el!
Thanks!
A big deal, mate! I’m honoured that you used my track 

Amazing project!
Thanks
That`s HUGE! 
;D thanks
fantastic kit of infographics! Nice design.
Thanks!
Veri nice!
Thanks!
You are a talented designer!
thanks)